Summary
The Nuclear Regulatory Commission’s Office of Advanced Reactors is issuing Interim Staff Guidance DANU-ISG-2026-02, “NRC Application Pathway for Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War,” under Docket ID NRC-2026-0760 [1]. The notice was signed November 18 by Mehdi Reisi Fard, director of the Division of Advanced Reactor Engineering, filed for public inspection November 20 as FR Doc. 2026-23753, and is scheduled for publication November 23, the date the guidance takes effect [1]. It cites the Atomic Energy Act, 42 U.S.C. 2011 et seq., as authority, and it is the guidance half of the NRC’s response to section 5(d) of Executive Order 14300; the rule half, 91 FR 67195, takes effect November 25 [1, 2].
What the record shows
The notice states the purpose in one sentence: the ISG is “to provide a roadmap to NRC requirements, and associated implementing guidance, in select foundational areas to support streamlined NRC reviews of certain applications” that rely on “prior U.S. Department of Energy (DOE) or Department of War (DOW) authorizations of demonstration reactors” [1].
It also states a limit. The roadmap “is not intended to be a comprehensive recitation of all applicable NRC requirements for a given requested approval” [1]. Its stated use is earlier in a developer’s planning: to help prospective applicants “maximize the overlap” between what DOE or the Department of War requires and what the NRC requires, so that the NRC staff can later rely on more information those departments already reviewed [1]. Where an application includes such information, the notice says, the staff “would appropriately adjust the focus and depth” of its review [1].
Three procedural statements in the notice bear on who is affected:
- Voluntary use. The guidance “is for voluntary use by future applicants and is not imposed on any current licensees or applicants,” so the NRC finds it is not a backfit or forward fit under 10 CFR 50.109 and Management Directive 8.4 and does not affect issue finality under Part 52 [1].
- A rule for Congressional Review Act purposes. The notice says the ISG “is a rule as defined in the Congressional Review Act,” and that the Office of Management and Budget did not find it to be a major rule [1].
- OIRA review. The Office of Information and Regulatory Affairs determined the final ISG is a significant regulatory action under Executive Order 12866, and the NRC submitted it for that review [1].
The rule the guidance supports
The October 26 final rule adds one paragraph to 10 CFR 50.43 [2]:
(f) An application under paragraph (e) of this section may include consideration of relevant information gathered from a utilization facility that has been previously authorized by the Department of Energy or the Department of Defense and that has been tested and has demonstrated the ability to function safely. Any reference to such a design must identify how attributes of the authorization satisfy NRC regulations, including paragraph (e) of this section.
It adds parallel language to 10 CFR 53.440(a)(1) for the Part 53 framework [2]. No change to Part 52 was needed because Part 52 references the Part 50 provision, according to the ISG notice [1]. The regulatory text keeps the title “Department of Defense,” which the NRC says avoids inconsistency with existing regulations under section 2(d) of Executive Order 14347 [2].
The placement changed between proposal and final. The April 2 proposal would have added the option as a third alternative, 50.43(e)(3), alongside the existing two [3]. After commenters said that would set a lower safety standard than 50.43(e)(1) and (2), the NRC moved it to a new paragraph (f) “to clarify and to reaffirm that this rulemaking does not alter the safety standard established in” 50.43(e) [2]. Under the final text, if a prior authorization does not supply all necessary information, the applicant must address the remaining gaps [2].
The final rule also lists what an applicant may consider including: the scope of the prior authorization and the testing, analyses and operating experience behind it; the safety functions and design features it addressed; and differences in design, operation or siting material to the NRC’s review [2]. The NRC did not quantify savings. It expects it “will not need to repeat technical reviews previously performed by DOE or DOW, to the extent that those reviews cover the same scope” [2].
Where it sits in the process
What executive order created the DOE-to-NRC pathway?
Section 5(d) of Executive Order 14300, signed May 23, 2025, directs the NRC to “Establish an expedited pathway to approve reactor designs that the DOD or the DOE have tested and that have demonstrated the ability to function safely,” with NRC review focused “solely on risks that may arise from new applications permitted by NRC licensure” [5]. This site has covered other NRC actions under the same order, including the November 7 final rule on contested adjudications.
The companion order, Executive Order 14301, directed the Secretary of Energy to create a pilot program for reactors outside the national laboratories under 42 U.S.C. 2140 and to “approve at least three reactors” with a goal of criticality in each by July 4, 2026 [6]. Section 2140 provides that the Atomic Energy Act’s licensing subchapter does not require a license for construction or operation of facilities “under contract with and for the account of the Commission,” a phrase the order applies to DOE [6, 7].
DOE reported on August 6 that Oklo’s Groves Isotope Test Reactor in Lockhart, Texas, was “the fifth DOE-authorized advanced reactor to achieve criticality this summer,” and that the test reactor “will inform the development of a future commercial variant” [8]. POWER Magazine reported that four reached zero-power criticality by July 4 (Antares Nuclear’s Mark-0, Valar Atomics’ Ward 250, Deployable Energy’s Unity and the Aalo-X test reactor) and that Unity went through DOE’s Nuclear Energy Launch Pad at Idaho National Laboratory rather than the original pilot program [9]. POWER also noted those demonstrations do not show sustained electricity production or the performance of a complete commercial plant [9].
Dates ahead
The steps run in this order: draft ISG comments closed May 18, 2026 [4]; the final rule was published October 26 and takes effect November 25 [2]; and the ISG takes effect on its November 23 publication [1]. The notice lists further possible work: a crosswalk between the NRC requirements in the ISG and DOE authorization requirements, and other memoranda of understanding [1]. A similar provision appears in the NRC’s separate proposed Part 57 microreactor rule, 91 FR 23628 (May 1, 2026), which is not yet final [2].
What the record does not show
- The ISG’s contents. The Federal Register notice describes the guidance as a roadmap in “select foundational areas” but does not list those areas [1]. The document itself is ADAMS Accession No. ML26239A071 [1].
- How the final ISG changed after comment. The NRC received 56 unique comment submissions on the draft and prepared a comment response document, ML26239A068 [1]. The notice does not summarize the changes.
- Any applicant. The NRC did not quantify the rule’s savings, saying they depend in part on the number of applications that reference a prior DOE or Department of War authorization [2]. No application referencing a DOE or Department of War authorization appears in the record this report draws on.
- Review time. Nuclear News reported that first-of-a-kind reviews could take roughly 18 months under the rule [10]. The rule itself sets no schedule [2].
- Which DOE documents count. The notice says an addendum to the NRC-DOE memorandum of understanding, ML25303A288, lets documented safety analyses for DOE-authorized facilities be leveraged [1]. The rule does not say whether a zero-power criticality test satisfies its condition that the prior facility was tested and shown to function safely; that is left to the information each applicant provides [2].
Positions on the record
The NRC’s position, stated in the final rule, is that “nothing in this rule delegates to DOE, DOW, or any other agency the NRC’s functions to evaluate a request for NRC approval, and nothing in this rule allows the NRC to forego an independent review” [2]. POWER Magazine reported that NRC Chairman Ho Nieh described the rule as delivering the executive order’s vision for an expedited path from DOE and Department of War projects to NRC commercial licensing, and said high-quality applications would let the agency review them more efficiently [9].
Beyond Nuclear and the Nuclear Information Resource Service filed comments on May 4, 2026 opposing the proposed rule [11]. Beyond Nuclear’s summary argues that the rule and the executive orders “dismantle the statutory firewall” between DOE’s promotional activities and the NRC’s safety findings, contrary to the Energy Reorganization Act of 1974, which abolished the Atomic Energy Commission [11]. It also says the Union of Concerned Scientists’ comments faulted the NRC’s use of the name “Department of War” [11]. The final rule does not name individual commenters; it reports 136 unique submissions on the proposal [2]. Nuclear News reported concern that the pathway could be seen as a shortcut, without attributing it to a named group [10].
Neither the notice nor the rule says how much of a DOE safety analysis the staff will accept without its own re-analysis. Section 5(d) of the order says NRC review should not revisit risks “already addressed in the DOE or DOD processes” [5]. The rule says the extent of reliance “depends on the information an applicant provides” [2].
Reading-room questions
Questions readers bring to this record, answered from the documents cited below.
- When does the NRC guidance for DOE-authorized reactor designs take effect?
- On its date of publication in the Federal Register, which is scheduled for November 23, 2026 [1]. The companion rule creating 10 CFR 50.43(f) takes effect November 25, 2026 [2].
- Can a company skip NRC review if DOE already authorized its reactor?
- No. The final rule states that nothing in it delegates the NRC's review functions to DOE or the Department of War or lets the NRC forgo an independent review; the applicant must still show compliance with NRC requirements and address any gaps [2].
- Is the NRC's DOE-to-NRC guidance mandatory for applicants?
- No. The notice says the ISG is for voluntary use by future applicants and is not imposed on current licensees or applicants [1].
- Which reactors could use the NRC's DOE authorization pathway?
- The rule covers commercial applications that reference a utilization facility previously authorized by DOE or the Department of Defense that has been tested and has demonstrated the ability to function safely [2]. DOE reported five DOE-authorized advanced reactors reached criticality in summer 2026, though none of those projects has filed an NRC application under the new pathway in the record this report draws on [8, 9].
Note on sourcing
The guidance is described from the NRC's Federal Register notice filed for public inspection on November 20, 2026 (FR Doc. 2026-23753); official publication is scheduled for November 23, and the published text could differ from the public-inspection copy. This report does not draw on the ISG document itself (ADAMS Accession No. ML26239A071) or on the NRC's comment response documents for the ISG or the rule, so the guidance's specific technical topics and the NRC's answers to individual commenters are not reported here. The 18-month estimate for first-of-a-kind reviews is as reported by Nuclear News and is not stated in the final rule. Statements attributed to NRC Chairman Ho Nieh are as reported by POWER Magazine. The Union of Concerned Scientists' comments are described only as Beyond Nuclear characterized them. No application invoking 10 CFR 50.43(f) or the revised 53.440(a)(1) appears in the record this report draws on.
Sources
- Interim Staff Guidance: NRC Application Pathway for Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War, DANU-ISG-2026-02, Docket ID NRC-2026-0760 (public inspection, FR Doc. 2026-23753)U.S. Nuclear Regulatory Commission, filed November 20, 2026 ·
public-inspection.federalregister.gov - NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War, Final Rule, 91 FR 67195 (RIN 3150-AL60; Docket ID NRC-2025-1503)U.S. Nuclear Regulatory Commission, October 26, 2026 ·
govinfo.gov - NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War, Proposed Rule, 91 FR 16584U.S. Nuclear Regulatory Commission, April 2, 2026 ·
govinfo.gov - Draft Interim Staff Guidance: NRC Application Pathway for Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War, 91 FR 20717U.S. Nuclear Regulatory Commission, April 17, 2026 ·
govinfo.gov - Executive Order 14300, Ordering the Reform of the Nuclear Regulatory Commission, 90 FR 22587Executive Office of the President, May 29, 2025 ·
govinfo.gov - Executive Order 14301, Reforming Nuclear Reactor Testing at the Department of Energy, 90 FR 22591Executive Office of the President, May 29, 2025 ·
govinfo.gov - 42 U.S. Code § 2140, Exclusions from license requirementU.S. Congress, accessed 2026-11-21 ·
law.cornell.edu - Office of Nuclear Energy Celebrates Fifth Advanced Reactor CriticalityU.S. Department of Energy, August 6, 2026 ·
energy.gov - NRC Finalizes Rule Allowing Reactor Applicants to Use DOE, DOW Demonstration Data (by Sonal C. Patel)POWER Magazine, October 22, 2026 ·
powermag.com - NRC finalizes rule on licensing reactors with prior DOE or DOD authorizationAmerican Nuclear Society (Nuclear News), October 22, 2026 ·
ans.org - NRC's "Nuclear Rubberstamp Commission" RuleBeyond Nuclear, May 7, 2026 ·
beyondnuclear.org
Subject headings
Cross-references
Other register entries filed under the same subject headings.
- No. 0032 · Rule · 3 shared headingsNRC sets fixed deadlines for contested licensing hearings in final rule, 91 FR 69446, effective Dec. 3
- No. 0016 · Report · 3 shared headingsNRC sets Sept. 22 mandatory hearing on Long Mott Xe-100 construction permit, 91 FR 53900
- No. 0039 · Authorization · 2 shared headingsNRC notices Part 2 of Holtec's Pioneer SMR-300 construction permit application, Docket Nos. 50-616 and 50-617